PROJECT EUROPE > BELGIUM > BRUXELLES

New Bayer office building

The Bayer sales organisation in Brussels will be selling its offices on Louizalaan and is currently building a completely new complex for approximately 350 employees.

Two HEK MCM platforms were installed for the mounting of the structure and the glass panels on the building (a single mast and a double mast). The fact that the platforms had to be moved 20 times in 10 weeks’ time was a special condition of this project. This required a streamlined planning that was exactly attuned to the work to be performed on the building at the defined times. The glass panels with a weight of 120 kg measure 1.20 m x 2.35 m. HEK could deliver on all fronts to the complete satisfaction of all involved parties.

HEK MCM SINGLE

Capacity

 

Min/Max platform length (m)

2.9 - 10.4

Min/Max platform width (m)

1.5 - 2.7

Max Payload capacity (kg)

2680

Max Payload at max platform length (kg)

2040

Max number of people

3

Speed (m/min)

12

First Anchor position (m)

3

Max lifting height tied (m)

200

Tie distance max (m)

8 - 10

Free topmast (m)

4.5

 

Dimensions and weights

 

Lowest transport height (m)

2.2

Height to platform (m)

1.6

1.5m platform section (kg)

179

0.8m platform section (kg)

119

1.5m mast section (SQ450x450) (kg)

75

 

Electrical Data

 

Rated power (kW)

2 x 5.5

Voltage (V)

400

Motor connection

Y*

Control Voltage (V)

24 DC

Control Voltage Frequency (Hz)

50 - 60

Power consumption (kW)

9.2

Power supply fuses (A)

25

Power cable (xmm2)

5 x 6

* Y = Star connection